Attached garage
Short run along the garage wall in surface conduit or inside the wall. Usually the fastest and least expensive install.
We install home and small-business EV chargers, check whether your electrical panel can carry the load, and pull the permit. Answer a few questions about your property and panel, add photos if you have them, and we'll send a written quote.
Every job starts with a load check, so the charger you buy runs at full speed without tripping your main breaker.
Wall connector install in garage, driveway or carport, including the dedicated circuit, permit and inspection.
A dedicated outlet for a plug-in charger or your vehicle's mobile cord. Industrial-grade receptacle and GFCI protection.
Panel replacement, subpanels, and service upgrades coordinated with your utility when the existing panel is full or undersized.
Energy monitors and smart panels that share capacity, often avoiding a costly service upgrade on older homes.
Each setup has its own wiring path and permit needs. Tell us which one you have and we'll plan the run.
Short run along the garage wall in surface conduit or inside the wall. Usually the fastest and least expensive install.
Weather-rated charger on the house wall or on a post, with conduit run underground when the spot is away from the house.
Chargers in assigned spaces, fed from the meter room. We prepare the drawings and load letter your HOA will ask for.
A typical 48A install on a 200A panel. Your quote breaks out each of these parts.
| 1 | Kitchen counters | 20A |
| 3–5 | Range | 50A 2P |
| 7–9 | Dryer | 30A 2P |
| 11–13 | A/C condenser | 40A 2P |
| 15 | Garage receptacles | 20A |
| 17–19 | EV charger | 60A 2P |
60A breaker · 48A continuous · 6 AWG Cu · ≈11.5 kW
Six short sections. Fields marked * are required. Your answers are saved in this browser as you go, so you can come back to finish.
Often not. A 48A charger needs a 60A circuit, which many 200A panels can carry. Older 100A panels with an electric range, dryer and A/C are the usual candidates for an upgrade or a load-management device. Your panel answers and photos tell us which case you're in.
Build year hints at the original service size and wiring. Many homes built before the 1980s were wired for 60–100A, and some used panel brands that are commonly replaced before adding a large new load.
Hardwired chargers can run up to 48A and avoid wear on a plug. A NEMA 14-50 outlet is limited to 40A of charging and works with portable cords. For daily use we usually recommend hardwired.
In most cities, yes. We file the permit, schedule the inspection, and include the fees in your quote.
A typical garage install takes 3–5 hours. Long wire runs, trenching or a panel upgrade can add a day, and service upgrades depend on the utility's schedule.
Yes. We'll need HOA approval and access to the meter room. We can provide the drawings and load letter most HOAs ask for.
Five minutes of questions and a few phone photos are usually all we need for a written quote.